DESIGN OF WASTEWATER TREATMENT PLANT (WWTP)

The WWTP will be designed to treat and consolidate the wastewater generated by BAUSCH HEALTH’s Farmatech sites, complying with applicable local and international regulations. Its capacity will be sized for future growth, processing between 35 and 40 m³/day.

AXIOM performed the detailed engineering with conceptual design, 3D planning through Revit and investment estimation; procurement management, including bidding and contract awarding; and construction and commissioning supervision to ensure quality and compliance with deadlines. In addition, it provided technical support for the project to ensure compliance with local and international regulations, such as Resolutions 631 of 2015 and 0330 of 2017.